TOD Study for the Virar-Panvel Corridor, Mumbai

LOCATION: 

GREATER MUMBAI

DATE: 

2018

PROJECT STATUS: 

Completed

CLIENT: 

World Bank Group

DOMAIN AREA: 

Transit Oriented Development (TOD)

POSITION HELD

Team Leader & TOD Expert

TEAM: 

Ernst & Young, Oasis Design Inc.

Project description 

The broad objective of the project for the 69.5km suburban rail corridor in Mumbai was to identify TOD Station Typologies within the corridor; prepare TOD Zone Plans for 3 stations; undertake a financial analysis of the same and prepare a land value capture model; and prepare recommendations for TOD Policy and DCR.

HTAU's role

As the Team Leader on the project we led the:

  • Development of Principles for TOD for the suburban rail corridor 

  • Preparation of methodology for TOD Place Types and application of the same on the corridor

  • Formulation of principles and guidelines for TOD DCR

  • Preparation of TOD DCR for the corridor as a reiterative process with the development of the TOD Zone Plan

  • Preparation of Urban Design Control Elements

  • Preparation of LVC strategies and the implementation framework for the TOD Zone Plans.

URBAN STRATEGY 

ZONE PLANS & HOLDING CAPACITY ASSESSMENTS